Software

Process monitoring and analysis

Measurements and laboratory results help you judge plant performance only when you can see how they change alongside operating conditions. Waiotech keeps these results by process unit and measurement point, so a process engineer can see the trend of each value, how it relates to other units and how complete the data are, all in one place.

Explore: measurements on one time axis, with normal ranges and recorded events. A value not recorded leaves a gap.

Measurements, indicators and interpretation

Process review brings together three kinds of information that should not be confused with one another. Waiotech keeps them apart.

Measurement
A value recorded at a given point and time, such as MLSS in an aeration basin or effluent ammonium. If a result was not recorded, its place stays empty; it is never filled with zero or an estimate.
Calculated indicator
A value derived from several measurements, such as SVI, F/M, sludge age or removal efficiency. If an input is missing, the indicator is not calculated and the software says which input is missing.
Interpretation
The engineer's judgement of what the numbers mean. The software compares each value with the normal range set for it, but it does not decide the cause of a change.
Biology indicators for each aeration basin. Dissolved oxygen in basin 1 is below its normal range. Sludge age is not calculated because the waste sludge flow was not recorded.

Why is effluent ammonium rising?

In this sample, effluent ammonium at a treatment plant rose in the second half of the month. It shows how a process engineer puts the recorded evidence together and what the next decision rests on. The data are a sample, and the method is a concept illustration.

  1. Effluent ammonium trend

    Laboratory results rose from about 1.2 mg/L in the first week of the month to 4.1 on 16 November. The 11 November result was not recorded and appears as a gap.

  2. Dissolved oxygen in basin 1

    Dissolved oxygen is drawn on its own axis because it is a different quantity, measured in a different place. Since 5 November the daily mean has been below its normal range. That the two changes coincide is a hypothesis, not proof.

  3. Blowers and the duty plan

    Blower 2 has been out of service since 5 November and blower 1 runs in its place. The number of running blowers did not change, so the drop in oxygen needs its own explanation, for example the state of the diffusers or how air is split between the two basins.

  4. Data that are missing

    MLSS was steady all month, but waste sludge flow was not recorded, so sludge age cannot be calculated. Effluent alkalinity was not measured in this period either. Neither possibility can be tested yet.

  5. The next decision

    The process engineer decides which measurements to add and which inspection to review before changing anything. The cause is still unknown, and the decision is recorded with its reasons.

Evidence reviewed

  • Dissolved oxygen, aeration basin 1consistent with the hypothesis
  • Mixed liquor temperatureneeds further review
  • Aeration blowersneeds further review
  • MLSS and sludge agenot enough data
  • Alkalinity and pHnot enough data
  • Effluent alkalinity and nitrate on sampling days
  • Waste sludge flow, daily
  • Result of the basin 1 diffuser inspection (WO-001049)

Where this is going

Process analysis in Waiotech is expanding. The aim is for an investigation like the one above to be carried out and recorded in the software itself: possible explanations set beside the data, a clear view of which are consistent with the data, which are not and which cannot be tested yet, and the engineer's decision kept with its reasons in the plant's history. Along the way the software does not replace engineering judgement and does not send commands to equipment.

How data get in

Laboratory results and readings are entered in log books or during routine rounds. A log book can be downloaded as an Excel file, filled in and uploaded again, and the plant's past records can be imported so that trends are complete from the start.

Operations management

Looking at your plant's data

Bring the last few months of laboratory results if you have them; we lay them side by side in Waiotech.