Product · Plant model

The process and the equipment of your plant, in one model.

On one side, units and streams. On the other, buildings, positions and equipment. Between them, the link that says which unit each piece of equipment serves.

Tap any unit, stream or piece of equipment.

SampleInlet pumping stationScreeningGrit and grease removalBiological treatmentAeration train 1Anoxic zone 1Aeration basin 1Aeration train 2Anoxic zone 2Aeration basin 2Secondary clarificationSecondary clarifier 1Secondary clarifier 2DisinfectionGravity thickeningSludge dewateringInlet pump houseWW-B-INLPretreatment buildingWW-B-PREBiological basins areaWW-A-BIOSecondary clarifier areaWW-A-SECBlower buildingWW-B-BLWSludge pump stationWW-B-RASDewatering buildingWW-B-SLGPumpMotorCoupling P-INL-01MCC-01SCR-01GC-01MX-01 BL-01 BL-02 BL-03CL-01CL-02 P-RAS-01 P-RAS-02 P-WAS-01SP-01 DP-02Intake and raw water pumpingRapid mix and coagulant dosingFlocculationSedimentationSand filtersFilter 1Filter 2Filter 3Filter 4Disinfection (chlorination)Treated water reservoirTransfer pumping stationSludge thickeningDrying bedsRaw water pump houseWT-B-INTChemical buildingWT-B-CHMFlocculation and settling areaWT-A-CLRFilter buildingWT-B-FLTTransfer pump houseWT-B-TPSPumpMotorCoupling P-RW-01 P-RW-02MCC-01 DP-03 DP-01CL-01MX-01FD-01SC-01 P-BW-01 P-BW-02 BL-AS-01V-F2-IN P-HL-01 P-HL-02

01 · Process view

Units within units, and streams with a direction.

Biological treatment is several aeration trains, and each train has an anoxic zone and an aeration basin. Return sludge, waste sludge, air and chemicals are each their own stream, with a clear from and to.

Process units

  • Biological treatmentWW-U-BIO
  • Aeration train 1WW-U-BIO-1
  • Anoxic zone 1WW-U-ANX-1
  • Aeration basin 1WW-U-AER-1
  • Aeration train 2WW-U-BIO-2
  • Secondary clarificationWW-U-SEC
  • Secondary clarifier 1WW-U-SEC-1
  • Secondary clarifier 2WW-U-SEC-2
  • Sludge lineWW-U-SLG
  • Gravity thickeningWW-U-THK
  • Sludge dewateringWW-U-DEW

Streams

  • Main flowAeration basin 1Secondary clarifier 1
  • Return sludge (RAS)Secondary clarifier 1Anoxic zone 1
  • Waste sludge (WAS)Secondary clarificationGravity thickening
  • Process airDosing pumpAeration basin 1
  • Internal recycleAeration basin 1Anoxic zone 1
  • Chemical feedDosing pumpDisinfection
Sample

02 · Physical view

Building, position, equipment, and its parts.

A position is the fixed installed location, like “RAS pump 1”. The equipment installed there has its own composition: pump, motor, coupling.

Sample
Sludge pump stationWW-B-RAS
PositionRAS pump 1WW-P-RAS-01
Pump package BWW-PU-0587200 m³/h · 15 kW
PumpWW-PU-0587-P
MotorWW-PU-0587-M
CouplingWW-PU-0587-C
PositionRAS pump 2WW-P-RAS-02
PositionWAS pumpWW-P-WAS-01
Serves Aeration train 1

03 · Position and equipment

The pump changes. The position and both histories stay.

In March 2026 pump A went to the workshop for an overhaul and pump B was installed at the same position. The position’s history continues unbroken, and each pump carries its own history with it.

The pump position stays put; the pump in it may change. Each keeps its own history.

Sample
20192020202120222023202420252026
Position WW-P-RAS-01
Pump A WW-PU-0412
In workshop
Pump B WW-PU-0587
  1. 7 Oct 2026Seal kit replaced · WO-1042WW-PU-0587
  2. 12 Mar 2026Pump B installed at the same positionWW-PU-0587
  3. 12 Mar 2026Pump A removed for workshop overhaulWW-PU-0412
  4. 14 Aug 2024Mechanical seal replacedWW-PU-0412
  5. 20 Nov 2022Coupling-end bearing replacedWW-PU-0412
  6. 6 May 2019Pump A installed at the positionWW-PU-0412

04 · Drawings

The P&ID you already have, now clickable.

Upload P&IDs, PFDs and site layouts as they are. Place points on the drawing, each linked to a real record: equipment, unit, stream or measurement point.

Sludge pump station P&ID · uploaded revision 2Tap the symbols on the drawing.
SOUTH WWTP · SLUDGE PUMP STATION PIPING & INSTRUMENTATION DIAGRAM DWG WW-PID-104 REV C SC-1XV-101HV-111 P-RAS-01MHV-112PI013HV-121 P-RAS-02MHV-122PI023HV-131 P-WAS-01MHV-132PI013TO ANOXIC ZONE 1FIT201TO THICKENERMCC-02

05 · Measurement points

What is measured, where, and in what unit.

Each measurement point belongs to exactly one unit, stream, position or piece of equipment. Manual readings are first-class; a data source, if there is one, is mapped to the point explicitly.

Sample
PointOnUnitSource24 h
Dissolved oxygen, aeration basin 1WW-MP-DO-1WW-U-AER-1mg/LSource
Dissolved oxygen, aeration basin 2WW-MP-DO-2WW-U-AER-2mg/LSource
MLSS, aeration basin 1WW-MP-MLSS-1WW-U-AER-1mg/LManual
Inlet flowWW-MP-Q-INWW-S-INFm³/hSource
Effluent TSSWW-MP-TSS-OUTWW-S-EFFmg/LManual

06 · QR tags

Scan the tag and the record opens.

Printed tags go on equipment, positions, measurement points or store shelves. A scan only finds the record; what the person can do stays exactly what their access allows.

Equipment tagWW-P-RAS-01
RAS pump 1
Shelf tagWH1-B3
Main store · shelf B-3
WH1-B3Stock location
Main store · shelf B-3
SK-45 Mechanical seal kit2
Scanning grants no extra access

07 · Classification and criticality

Group, class, type, and the operational criticality of each position.

Equipment classification has three levels. Operational criticality belongs to the position, not the pump that happens to be there today, because it comes from what that position does in the process.

Sample

Equipment classification

Rotating equipmentPumpCentrifugal pump

Operational criticality by position

WW-BL-02Aeration blower 2High
WW-BL-03Aeration blower 3 (standby)Medium
WW-P-RAS-01RAS pump 1High
WW-DP-01Polymer dosing pumpLow

Connections

Where this connects

The plant model is the context for all the work: work orders target a position or equipment, readings belong to measurement points, and failures are recorded with their effect on the process.

  1. Plant modelUnit, stream, position, equipment
  2. Work orderTarget: position or equipment
  3. Measurement pointReadings and process conditions
  4. Failure eventEffect on units and streams

Common questions

What if our equipment codes are different?

Keep your own codes. Waiotech takes the code from you and only checks it is unique within its category; the codes on this page are just samples.

Do we have to redraw our drawings?

No. Upload the P&ID or site layout you already have as an image or PDF, and place points on it that link to records. Later versions of the drawing are added as new revisions.

What’s the difference between a position and equipment?

A position is the fixed installed location, like “RAS pump 1”. Equipment is the machine itself, which can be replaced, sent to the workshop or installed elsewhere. Each has its own history, and they are linked.